User Tools

Site Tools


crystallography:collection:frx:maintenance

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
crystallography:collection:frx:maintenance [2016/07/12 09:55] bonnefoncrystallography:collection:frx:maintenance [2023/11/01 20:19] (current) – external edit 127.0.0.1
Line 40: Line 40:
 FLOW2TUBE 4.3-4.2 FLOW2TUBE 4.3-4.2
  
 +----
 +CRYOSTREAM
 +
 +Let if warm up first
 +PROGRAM/ turn black knob: "Add Phase: End"
 +ENTER twice / HOLD (green light come OFF)
 +
 +2h to cool up
 +1h-30 min to cool down
 +
 +
 +----
 +BEAM 
 +
 +Point detector         every week
 +Check beam intensity
 +Slide on the collimator and tighten
 +
 +SCALE: 3   DIVISION: 2
 +ON   ADJUST ZERO with dial
 +
 +on XG Control: Shutter / OPEN     read > 4,  never above 5.0
  
  
  
crystallography/collection/frx/maintenance.1468317335.txt.gz · Last modified: (external edit)