User Tools

Site Tools


crystallography:collection:frx:on

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
crystallography:collection:frx:on [2016/07/25 09:41] – created bonnefoncrystallography:collection:frx:on [2023/11/01 20:19] (current) – external edit 127.0.0.1
Line 1: Line 1:
 Turn ON FR-X Turn ON FR-X
  
-===== Turn in-house FR-X OFF =====+===== Turn in-house FR-X ON =====
  
 ---- ----
  
-==== Engine Room ====+==== Technical Room E0044 ====
  
-Switch ON the main switch of the water cooling device in the engine room.+Turn the tap on the main water inlet to the ON position. 
 + 
 +{{:crystallography:collection:frx:red_valve.jpg?400|}} 
 + 
 +Switch ON the water chiller (HASKRIS) using the main switch only.
 Wait until the temperature is stabilized at 17°C. Wait until the temperature is stabilized at 17°C.
  
 +{{:crystallography:collection:frx:haskins.jpg?200|}}
 +{{:crystallography:collection:frx:haskins_closeup.jpg?400|}}
  
-Switch ON the nitrogen compressor in the engine room using the touch panel.+Switch ON the nitrogen compressor at the back, then start the nitrogen flow with the touch panel.
 After a 3 min idle wait, the pump should stabilize in 30 min. After a 3 min idle wait, the pump should stabilize in 30 min.
-Wait for 1 h. +Wait for 1 h. 
 + 
 +{{:crystallography:collection:frx:n2.jpg?150|}} 
 +{{:crystallography:collection:frx:n2_closeup.jpg?400|}}  
 + 
 +----
  
 ==== FR-X ==== ==== FR-X ====
  
-Switch the main power source ON.+Switch ON the two fans of AFC-11.
  
-Reset and then switch ON at the back of the FR-X.+{{:crystallography:collection:frx:acf11_back.jpg?400|}}
  
-POWER ON on the FR-X main panel.+Switch ON AFC-11 Goniometer controller.
  
-Start the Vacuum on the XG Control panel. Wait until vacuum is below 1.10E-4 (about 1h30).+{{:crystallography:collection:frx:afc11_closeup.jpg?600|}}
  
-Decrease gradually the voltage and intensity from 45 kV and 66 mA to 20 kV and 10 mAFirst step 66->60 mA, then 45->40 kV. Wait 10 s. Then decrease by steps of 10. (Lower the intensity first)+Switch ON the vacuum pump below the Cobra Controller.
  
-Turn X-RAY OFF on the XG Control panelWait 1h.+{{:crystallography:collection:frx:pump1.jpg?250|}} 
 +{{:crystallography:collection:frx:pump1_closeup.jpg?250|}}
  
 +Switch ON the vacuum pump below the BioSAXS.
  
 +{{:crystallography:collection:frx:pump2.jpg?250|}}
 +{{:crystallography:collection:frx:pump2_closeup.jpg?350|}}
  
 +Switch ON the transformer.
  
 +{{:crystallography:collection:frx:main_power_supply.jpg?600|}}
  
 +Reset and then switch ON the generator at the back.
  
 +{{:crystallography:collection:frx:frx_back.jpg?400|}}
 +
 +POWER ON on the front main panel.
 +Press both DOOR LOCK buttons.
 +
 +{{:crystallography:collection:frx:frx_front.jpg?600|}}
 +
 +Start the Vacuum on the XG Control panel. 
 +Wait until vacuum is below 1.10E-4 (about 1h30).
 +
 +{{:crystallography:collection:frx:xg.png?600|}}
 +
 +Turn X-Rays ON on the XG Control panel.
 +Wait 1-2h if it was down for a few hours (heating will generate gaz that may disrupt the vacuum if the level is not low enough). Wait overnight if it was down for a few weeks.
 +
 +Start the AGING procedure.
 +Short aging lasts 31 min, long aging lasts 6h. 
 +Wait 1h30 for the beam to stabilize before data collection.
  
 ---- ----
Line 39: Line 75:
 ==== Cryostream ==== ==== Cryostream ====
  
-Program / Ramp (change with dial) / Enter+Switch ON the helium compressor.
  
-Choose the speed (up to 360K/h) / Enter +{{:crystallography:collection:frx:helium.jpg?300|}} 
-Target / Ambient / Enter +{{:crystallography:collection:frx:helium_back.jpg?250|}}
-Enter / Enter +
-Start+
  
-When ambient temperature is reached, stop +Switch ON on the back of the device. 
-Turn OFF at the back+ 
 +{{:crystallography:collection:frx:cobra_back.jpg?600|}} 
 + 
 +Cycle Start/Start 
 +For the first hour the temperature won't really decrease much. 
 +Final temperature should be around 100 K. 
 + 
 +{{:crystallography:collection:frx:cobra_front.jpg?600|}}
  
 ---- ----
 +
 +==== Detector ====
 +
 +Switch ON the EIGER water chiller.
 +
 +{{:crystallography:collection:frx:eiger_chiller.jpg?400|}}
 +
 +Switch ON the power supply for the EIGER.
 +
 +{{:crystallography:collection:frx:eiger_power_supply.jpg?600|}}
 +
 +Switch ON the framegrabber.
 +
 +{{:crystallography:collection:frx:framegrabber.jpg?600|}}
  
crystallography/collection/frx/on.1469439671.txt.gz · Last modified: (external edit)