User Tools

Site Tools


vitrobot

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
vitrobot [2023/01/13 16:18] crucifixvitrobot [2023/11/01 20:18] (current) – external edit 127.0.0.1
Line 9: Line 9:
   * fill a dry 5 L tank with liquid nitrogen   * fill a dry 5 L tank with liquid nitrogen
   * label grid boxes with the name of the experiment   * label grid boxes with the name of the experiment
-  * check several things: +  * check plasma cleaner is reserved 
-       plasma cleaner is reserved+  * Assemble the necessary tools:
        * EM_grids grids are available and present in sufficient number        * EM_grids grids are available and present in sufficient number
-       * all part of the coolant container are dry +       * all part of the coolant container (make sure that they are dry) 
-       * both vitrobot tweezers, big tweezer and blot paper clipping ring are not missing+       * both vitrobot tweezers, big tweezer and blot paper clipping
  
 ==== Starting up the vitrobot ==== ==== Starting up the vitrobot ====
Line 151: Line 151:
    * 11. if not yet done on vitrobot, enable the humidity switchbox to start      * 11. if not yet done on vitrobot, enable the humidity switchbox to start  
  
-==== Assemble different part of the coolant container like showing below ====+==== Assemble different part of the coolant container as pictured below ====
 {{ :coolant-container-built.jpg?nolink |}} {{ :coolant-container-built.jpg?nolink |}}
  
vitrobot.1673626700.txt.gz · Last modified: (external edit)